BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20181206T193000Z
DTEND:20181206T210000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Business Case and Technical Challenges for Shannon to Dublin Water Pipeline
DESCRIPTION:Ervia's CEO Mike Quinn will present the business case and technical challenges associated with the Parteen Basin Scheme including abstraction of water from the lower Shannon\, treatment at Birdhill and pumping the treated water 170km to a reservoir at Peamount in South County Dublin.  He will discuss the economics of the various iterations that led to the current proposal along with the technical challenges of delivering and operating the asset in a safe and efficient manner for future generations.
X-ALT-DESC;FMTTYPE=text/html:<span style="font-size:12pt"><span style="font-family:helvetica\,sans-serif"><span style="color:rgb(68\, 68\, 68)">Ervia&#39\;s CEO Mike Quinn&nbsp\;will present the business case and technical challenges associated with the Parteen Basin Scheme including abstraction of water from the lower Shannon\,&nbsp\;treatment at Birdhill and pumping the treated water 170km to a reservoir at Peamount in South County Dublin.&nbsp\; He will discuss the economics of the various iterations that led to the current proposal along with the technical challenges of delivering&nbsp\;and operating the asset in a safe and efficient manner for future generations.</span></span></span><br />\n<br />\n<br />\n&nbsp\;
LOCATION:The Strand Hotel\, Ennis Road\, Limerick
UID:e.3269.293
SEQUENCE:3
DTSTAMP:20260515T044514Z
URL:http://members.limerickchamber.ie/events/details/business-case-and-technical-challenges-for-shannon-to-dublin-water-pipeline-293
END:VEVENT

END:VCALENDAR
